Large-scale doseur site
In a joint venture with Alluvia & Vigier Beton Seeland Jura, we built a large-scale storage plant consisting of three row dosing (hopper) units. For direct access to demolished concrete, the plant was built at a demolition site (paper factory in Biberist, Switzerland). In operation since May 2023, the plant has a yearly storage capacity of around 1000t of CO₂.